Rank Approvals by What Waiting Costs

A concept that shows a busy approver which pending purchase requests are losing money by waiting, and makes it impossible to approve a price that no longer exists.


Product

Approval Risk Radar

Role

Solo Product Owner

At a glance

  • Problem: Purchase approvals sit in busy approvers’ queues for weeks. Meanwhile vendor quotes expire and prices move, and nobody can see the money at risk due to delay.
  • What I built: The prototype shows a risk queue that ranks pending requests by money at risk with a one-screen brief for the approver, and approval actions that change depending on what happened to the price.
  • The key decision: I have separated the money already lost to delay (confirmed) from what waiting could still cost (estimated), and put only the risk that faster approval can prevent at the top.
  • Evidence: Built from a problem that I’ve lived through as a requester waiting for PR approvals. 22 edge-case tests have successfully passed using the built-in test controls. Every number is calculated in code while AI only writes the short summary.
  • My role: Solo Product Owner. I did problem framing, logic design, prototype building, and testing.
  • Links: Try it live · Quick Walkthrough

Topics covered

The problem, from my own desk

At my current company, I raised purchase requests for the website’s software tools: 6 to 7 of them, including new purchases and renewals. Each PR went through a request, a purchase order, and approvals from senior leadership, procurement and finance, then payment.

A single purchase took about a month, and 2 to 3 weeks of that was simply waiting for approvals. Follow-ups went through my manager, because nobody owned chasing the approver. Once, the vendor raised its price while our approval was still pending, so we started budgeting 10 to 20% above the listed price. I kept my own spreadsheet of renewal dates, because no system did it for me.

That spreadsheet is the real signal to check because if people build their own trackers, it means that the product isn’t showing them what matters.

What exists, and the gap

Approval tools I looked at (from public product pages, November 2026) mostly chase time and send reminders, then escalation after a set number of days. That treats a small renewal and a ₹24 lakh hardware order with an expiring quote exactly the same.

An approver’s real question is different: which of these is costing us money by waiting?

The key decision: two kinds of money at risk

  • Extra cost so far (confirmed): This cost is the vendor’s latest price minus the approved amount, if it went up. This money is already lost to the delay.
  • Risk if it waits (estimated): If the quote expires within 7 days, I assumed that the vendor re-prices by 10% of the current quote. The 10% comes from the margin I learned to budget at my company, and it is one setting that can be changed if required.

Money at risk = confirmed + estimated, it is always shown with the breakdown.

My first version got this wrong. For a quote about to expire, it counted the entire purchase as at risk. A laptop order showed ₹27.6 lakh at risk when the real confirmed extra cost was ₹3.6 lakh. An expiring quote doesn’t mean you lose the purchase; it means the price can rise. I noticed it in testing and hence split the two numbers.

That led to the ranking rule. A price increase that has already happened can’t be undone by approving faster. It needs a decision. An expiring quote is the only risk that speed actually prevents. So the queue is ordered as follows:

  1. Expired and expiring quotes, with the fewest days left first
  2. Price increases, and the largest first
  3. Everything else

Renewals that lapse within 14 days are flagged “Service at risk”, irrespective of money at risk, because the risk there is losing access, not price.

Approval actions that follow the price

Same, or lowerApprove ₹X, at the latest price
Up by 10% or lessApprove ₹X (incl. +₹Y): one click, difference shown clearly
Up by more than 10%Send for full re-approval at the new amount, and Approve CTA is disabled
Quote expiredRequest re-quote: same request, approval history is kept

A bug I found: in one version, a request whose price had risen 15% could be approved at the old price with one click. Now the button always shows the amount being approved, so nobody can sign off a price that no longer exists.

An expired quote doesn’t need a new request, it needs a new price. So it goes back for a re-quote, and the new price follows the same 10% rule.

Approving moves the request along a simple chain (department head, then finance, then ready for purchase order), so it’s clear where each request sits. I deliberately stopped there because the purchase orders and vendor workflows are scoped for a different product.

What the AI does, and doesn't

The AI writes only the two-line summary explaining “what and why”, from the request’s own justification. Every number, date and ranking comes from code.

An early version added reasons that weren’t in the data, such as “before availability runs out”. So to avoid invented explanations, the summary is now limited to the justification field.

How I tested it

I built test controls into the prototype with preset scenarios, editable values on every request, and the calculation for each request logged in the browser console, so I could check what’s on screen against the maths.

The edge cases include:

  • Expiry boundaries: today, tomorrow, exactly 7 days, 8 days, already expired
  • Price boundaries: +5%, exactly +10%, just over +10%, +15%, a price drop
  • Combined risks, invalid inputs (an approved amount of zero), and large amounts in Indian number format
  • The re-quote flow, queue order with all cases at once, and consistency across every screen

One boundary case was instructive: +10% and +10.001% both displayed as “10.0%” but led to different actions. Near the limit, the percentage now shows two decimals, so the label never contradicts the action.

What I haven't proven

  • I haven’t validated it with procurement teams (except my own experience at my company). How often price drift and quote expiry really happen is the first thing to check.
  • The 10% re-price assumption is mine. A real version should learn it from quote history, by category.
  • It runs on mock data, with no connection to real approval or ERP systems.
  • Who sets the tolerance (finance policy, by amount or category) is an open question.

What I'd do next

  1. I will talk to 3 to 5 procurement managers about how often approvals outlive quotes.
  2. Use past quote data to set the re-price assumption per category.
  3. I will measure the cycle time for at-risk requests, the share of approvals that outlive their quote, and money saved against a reminder-only baseline.
  4. Make the tolerance a finance policy setting rather than a fixed 10%.